Please be aware that starting March 26th and through the next couple of weeks in Vermont, we will be taking delivery of furniture for the Davis 4th floor.
As a result, the 1st floor hallway between the loading dock of the Main building and the elevators in the Davis building will be heavily traveled by movers and their carts.
In addition, there will be a lot of activity in the executive garage with trucks coming in and out and moving personnel unloading several tractor trailers.
We ask that these areas be avoided if possible but should employees need to travel through them please use caution and pay attention.
Thank you.